Smart Charge charging stations in Australia

Data as of 12.11.2026

charging places24
of them public24
public with fast charging (50 kW+)1
known networks1

On the map: 24 charging places from open sources, 24 of them public. Not every charger that exists; places with reliability below 40 are not included.

The network is present in 6 cities in Australia; it is 1% of the public locations of the country shown here.

Fast DC charging from 50 kW: 1 location (4%); 150 kW or more: 0 locations.

13% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Cities

CityLocations
Newcastle2
Echuca · on the map2
Port Macquarie1
Muswellbrook · on the map1
Coffs Harbour1
Broken Hill · on the map1

Locations by maximum power

PowerLocationsShare
AC 11–22 kW313%
DC 50–149 kW14%
AC, power not stated2083%

Connectors

ConnectorLocations
Type 223
CCS21

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.