TOK charging stations in Azerbaijan
On the map: 25 charging places from open sources, 25 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 9 cities in Azerbaijan; it is 9% of the public locations of the country shown here.
Fast DC charging from 50 kW: 25 locations (100%); 150 kW or more: 7 locations.
8% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Cities
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| DC 50–149 kW | 18 | 72% |
| 150 kW and more | 7 | 28% |
Connectors
| Connector | Locations |
|---|---|
| GB/T DC | 25 |
| CCS2 | 24 |
| GB/T AC | 2 |
| Type 2 | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
| Source | Licence | Locations |
|---|---|---|
| Open Charge Map | CC BY 4.0 (provider licence shown on the point card) | 25 |
| OpenStreetMap | ODbL 1.0 | 2 |
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.