EV charging stations in Saint-Jérôme, Canada
On the map: 88 charging places from open sources, 87 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 20 locations (23%); 150 kW or more: 7 locations.
95% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.3 here, 2.0 on average across Canada.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Saint-Sauveur, QC - Tesla Supercharger | Tesla | 325 | Tesla (NACS)×16 | 11.2026 |
| BRCC - St-Sauveur - Resto A.M. | Circuit électrique | 320 | CCS1×6, Tesla (NACS)×4 | 11.2026 |
| Brunet - Ste-Adèle - Ultra | FLO | 320 | CCS1×2 | 11.2026 |
| Saint-Jérôme, QC - Tesla Supercharger | Tesla | 250 | Tesla (NACS)×6 | 11.2026 |
| RECHARGECO ST-ANTOINE 02 | ChargePoint | 200 | CCS1×2 | 11.2026 |
| BRCC - St-Jérome - Couche-Tard - de la Salette | Circuit électrique | 180 | CCS1×4, CHAdeMO×2 | 11.2026 |
| BRCC AFF - Léveillé Ford | Circuit électrique | 150 | CCS1×18 | 11.2026 |
| RECHARGECO PRÉVOST 01 | ChargePoint | 125 | CCS1, CHAdeMO | 11.2026 |
| BRCC - Sainte-Anne-des-Lacs - Shell | Circuit électrique | 120 | CCS1×2, CHAdeMO×2 | 11.2026 |
| BRCC - Morin Heights - Couche-Tard | Circuit électrique | 100 | CCS1×2, CHAdeMO×2 | 11.2026 |
| BRCC - Saint-Hippolyte - Centre Roger-Cabana | FLO | 100 | CCS1×2, CHAdeMO×2 | 11.2026 |
| BRCC - Saint-Jérôme - Porte du Nord | Circuit électrique | 100 | CCS1×7, CHAdeMO×7 | 11.2026 |
| Super C - St Jerome | FLO | 100 | CCS1×4, CHAdeMO | 11.2026 |
| RECHARGECO ST-SAUVEUR 01 | ChargePoint | 62 | CCS1, CHAdeMO | 11.2026 |
| BRCC - Prevost - Ultramar | Circuit électrique | 50 | CCS1, CHAdeMO | 11.2026 |
| BRCC - St-Hubert - Piedmont | FLO | 50 | CCS1×3, CHAdeMO×3 | 11.2026 |
| BRCC - St-Hubert - St-Jérôme | FLO | 50 | CCS1, CHAdeMO, Type 1 | 11.2026 |
| Harnois Énergies – Esso Proxi Ste-Adèle | FLO | 50 | CCS1, CHAdeMO, Type 1 | 11.2026 |
| Hydro-Québec | Network not known | 50 | CCS1×2 | 11.2026 |
| Tous les jours | Network not known | 50 | CCS1×2 | 11.2026 |
AC chargers: 67. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Circuit électrique | 43 |
| FLO | 26 |
| Tesla | 8 |
| ChargePoint | 6 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 60 | 69% |
| AC 11–22 kW | 6 | 7% |
| DC 50–149 kW | 13 | 15% |
| 150 kW and more | 7 | 8% |
| AC, power not stated | 1 | 1% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 62 |
| CCS1 | 18 |
| CHAdeMO | 12 |
| Tesla (NACS) | 10 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.