EV charging stations in Shaoguan, China
On the map: 51 charging places from open sources, 46 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (4%); 150 kW or more: 2 locations.
0% of the locations are confirmed by two or more sources; 0% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 0.4 here, 5.7 on average across China.
Open data cover only part of the chargers here. Source
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| 广东交通集团充电站 | 广东省交通集团 | 480 | GB/T DC×14 | — |
| 广东交通集团充电站 | 广东省交通集团 | 480 | GB/T DC×12 | — |
AC chargers: 0. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Shaoguan Jinshun New Energy · on the map | 40 |
| 广东省交通集团 | 2 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| 150 kW and more | 2 | 4% |
| Power not stated | 44 | 96% |
Connectors
| Connector | Locations |
|---|---|
| GB/T DC | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
| Source | Licence | Locations |
|---|---|---|
| OpenStreetMap | ODbL 1.0 | 46 |
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.