EV charging stations in Žďár nad Sázavou, Czechia
On the map: 21 charging places from open sources, 15 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 6 locations (40%); 150 kW or more: 1 location.
100% of the locations are confirmed by two or more sources; 93% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.0 here, 2.4 on average across Czechia.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Nabíjecí stanice E.ON Drive Public | E.ON | 300 | CCS2×8 | 10.2026 |
| EON Měřín | E.ON | 50 | CCS2×2 | 10.2026 |
| futurego | ČEZ | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| ČEZ | ČEZ | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| ČEZ Public Charging Station(AC+DC). | ČEZ | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| ČEZ futurego Charging station | ČEZ | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 10.2026 |
AC chargers: 6. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| E.ON | 4 |
| ČEZ | 4 |
| OlifeEnergy · on the map | 1 |
| PRE | 1 |
| Shell Recharge | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 2 | 13% |
| DC 50–149 kW | 5 | 33% |
| 150 kW and more | 1 | 7% |
| AC, power not stated | 4 | 27% |
| DC, power not stated | 3 | 20% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 11 |
| CCS2 | 9 |
| CHAdeMO | 5 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.