EV charging stations in Fontainebleau, France
On the map: 27 charging places from open sources, 25 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 3 locations (12%); 150 kW or more: 3 locations.
56% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 1.2 here, 2.5 on average across France.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Fastned Aire d’Achères - La Forêt | Fastned | 300 | CCS2×4, CHAdeMO×2, Type 2×2 | 11.2026 |
| EVzen - La Chapelle La Reine, Super U La Chapelle La Reine | EVzen | 180 | CCS2×6, Type 2 | 11.2026 |
| Ury, France | Tesla | 150 | CCS2×20, Type 2×20 | 11.2026 |
AC chargers: 18. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 18 | 72% |
| DC under 50 kW | 4 | 16% |
| 150 kW and more | 3 | 12% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 25 |
| Schuko | 12 |
| CCS2 | 7 |
| CHAdeMO | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.