EV charging stations in Guérande, France
On the map: 51 charging places from open sources, 49 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 14 locations (29%); 150 kW or more: 7 locations.
67% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 2.9 here, 2.5 on average across France.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Fastned Arzal | Fastned | 400 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Guérande | IECharge | 320 | CCS2×2 | 11.2026 |
| Saint-Molf | IECharge | 320 | CCS2×2 | 11.2026 |
| Best Western - Guérande | Sydego | 200 | CCS2×3, CHAdeMO, Type 2 | 11.2026 |
| Bricomarché - Nivillac | Powerdot | 200 | CCS2×3, CHAdeMO, Type 2 | 11.2026 |
| Intermarché - Le Pouliguen | Powerdot | 200 | CCS2×3, CHAdeMO, Type 2 | 11.2026 |
| Freshmile France/LMKVBZ3ID1CXDD | Morbihan énergies | 180 | CCS2×4, Type 2×2 | 11.2026 |
| Freshmile France/LMBT40AO71ET5O | Freshmile | 120 | CCS2×2, Type 2 | 11.2026 |
| LFR1136EVCP03 | Lidl | 120 | Type 2×4, CCS2×2 | 11.2026 |
| LFR4001EVCP01 | Lidl | 120 | CCS2×4, Type 2×4 | 11.2026 |
| Freshmile France/LMKVAQCQU1CX80 | Morbihan énergies | 108 | CCS2×2, Type 2 | 11.2026 |
| Intermarché - Guérande | Powerdot | 100 | CCS2×4, CHAdeMO×2, Type 2×2 | 11.2026 |
| Parc d'activité de l'estuaire | Freshmile | 50 | Type 2×2 | 02.2021 |
| Volvo - Général Automobile - Guérande - powered by DRIVECO | Drive Eco | 50 | Type 2×3, CCS2, Schuko | 11.2026 |
AC chargers: 28. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Sydego | 11 |
| Freshmile | 7 |
| Izivia | 7 |
| Morbihan énergies | 3 |
| Powerdot | 3 |
| Equans | 2 |
| IECharge | 2 |
| Lidl | 2 |
| Borneco | 1 |
| Bump | 1 |
| Drive Eco · on the map | 1 |
| Driveco | 1 |
| E-Flux | 1 |
| E.Leclerc | 1 |
| Fastned | 1 |
| Mobilize | 1 |
| Parera Mobilité | 1 |
| Rossini Energy | 1 |
| Stations-e | 1 |
| Zephyre | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 3 | 6% |
| AC 11–22 kW | 25 | 51% |
| DC under 50 kW | 7 | 14% |
| DC 50–149 kW | 7 | 14% |
| 150 kW and more | 7 | 14% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 41 |
| CCS2 | 20 |
| Schuko | 19 |
| CHAdeMO | 8 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.