EV charging stations in Aalen, Germany
On the map: 78 charging places from open sources, 73 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 14 locations (19%); 150 kW or more: 10 locations.
51% of the locations are confirmed by two or more sources; 92% were last confirmed in 2025 or 2026.
Without a known network: 18 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.9 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| E-Center Aalen, Heinrich-Rieger-Str. | EnBW | 400 | CCS2×8 | 09.2026 |
| EnBW-Ladestation | EnBW | 400 | CCS2×8 | 10.2026 |
| Ritter Recycling GmbH | Network not known | 400 | CCS2×2 | 09.2026 |
| Aral Pulse | EnBW | 300 | CCS2×6 | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4 | 09.2026 |
| POTR | Plenitude | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 300 | CCS2×2 | 09.2026 |
| Comfort Charge | Comfortcharge | 200 | CCS2×4 | 09.2026 |
| EnBW ODR AG | EnBW ODR | 150 | CCS2×2 | 09.2026 |
| EnBW-Ladestation | EnBW | 150 | CCS2×2 | 10.2026 |
| Citywatt GmbH | Citywatt | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Kaufland | Kaufland | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Lidl | Lidl | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| No name in the data | E-Merge Mobility | 50 | CCS2×2, Type 2×2 | 09.2026 |
AC chargers: 55. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| EnBW ODR | 16 |
| ladenetz.de | 8 |
| EnBW | 7 |
| ChargePoint | 3 |
| Lidl | 2 |
| deer | 2 |
| B+B Parkhaus · on the map | 1 |
| CUBOS | 1 |
| Charge&Fuel | 1 |
| Citywatt | 1 |
| Comfortcharge | 1 |
| E-Merge Mobility | 1 |
| E-Wald | 1 |
| Georg Jos. Kaes | 1 |
| Kaufland | 1 |
| PBW | 1 |
| Pfalzwerke | 1 |
| Plenitude | 1 |
| SCHARR | 1 |
| SMATRICS | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 55 | 75% |
| DC 50–149 kW | 4 | 5% |
| 150 kW and more | 10 | 14% |
| Power not stated | 4 | 5% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 59 |
| CCS2 | 14 |
| Schuko | 6 |
| CHAdeMO | 4 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.