EV charging stations in Alzenau, Germany

Data as of 12.11.2026

charging places57
of them public45
public with fast charging (50 kW+)10
known networks16

On the map: 57 charging places from open sources, 45 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 10 locations (22%); 150 kW or more: 6 locations.

73% of the locations are confirmed by two or more sources; 89% were last confirmed in 2025 or 2026.

Without a known network: 9 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.2 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
E.ON Drive InfrastructureE.ON300CCS2×610.2026
EnBW-LadestationEnBW300CCS2×810.2026
Greenman Energy Operations GmbH & Co. KGGreenman Energy300CCS2×209.2026
Ladestation Shell Alzenau SüdEnBW300CCS2×2, CHAdeMO10.2026
2030CUBOS235CCS2×210.2026
EWE Go GmbHEWE Go150CCS2×210.2026
AVEMO FreigerichtNetwork not known50CCS2×209.2026
E - Ladestation An der BurgEnergieversorgung Alzenau50CCS2, Type 209.2026
LidlLidl50CCS2, CHAdeMO, Type 210.2026
No name in the dataNetwork not known50CCS2×2, Type 2×209.2026

AC chargers: 35. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC up to 7 kW24%
AC 11–22 kW3169%
DC 50–149 kW49%
150 kW and more613%
AC, power not stated24%

Connectors

ConnectorLocations
Type 236
CCS210
Schuko8
CHAdeMO2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.