EV charging stations in Bad Langensalza, Germany

Data as of 12.11.2026

charging places23
of them public20
public with fast charging (50 kW+)9
known networks7

On the map: 23 charging places from open sources, 20 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 9 locations (45%); 150 kW or more: 5 locations.

65% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.

Without a known network: 2 locations.

Fast DC chargers from 50 kW per 10 public locations: 4.5 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
6130CUBOS235CCS2×210.2026
TotalEnergies Charging SolutionsTotalEnergies200CCS2×810.2026
Großengottern - EDEKATEAG150CCS2×210.2026
Großengottern - REWETEAG150CCS2×410.2026
Schlotheim - EDEKATEAG150CCS2×210.2026
TotalEnergies Charging SolutionsTotalEnergies75CCS2×4, Type 2×209.2026
Alexander Deutschladenetz.de50CCS2×209.2026
Alexander Deutschladenetz.de50Type 2×3, CCS2×2, CHAdeMO09.2026
Dachwig - MühlengrillTEAG50CCS2×210.2026

AC chargers: 11. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

Locations by maximum power

PowerLocationsShare
AC 11–22 kW1155%
DC 50–149 kW420%
150 kW and more525%

Connectors

ConnectorLocations
Type 213
CCS29
Schuko3
CHAdeMO1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.