EV charging stations in Düren, Germany
On the map: 122 charging places from open sources, 118 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 25 locations (21%); 150 kW or more: 17 locations.
69% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 14 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.1 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Eviny | Bilkraft | 400 | CCS2×2 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Düren | Fastned | 300 | CCS2×4, CHAdeMO×2 | 10.2026 |
| EWE Go GmbH | EWE Go | 300 | CCS2×4 | 10.2026 |
| EWE Go GmbH | EWE Go | 300 | CCS2×4 | 10.2026 |
| EnBW Shell | EnBW | 300 | CCS2×4, CHAdeMO | 10.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×4, Type 2 | 10.2026 |
| Fred Pfennings GmbH & Co. KG | Fred Pfennings | 300 | CCS2×2 | 10.2026 |
| Fred Pfennings GmbH & Co. KG | Fred Pfennings | 300 | CCS2×4 | 09.2026 |
| Shell | EnBW | 300 | CCS2×4, CHAdeMO | 10.2026 |
| bike-energy Ladestation | EnBW | 300 | CCS2×8 | 10.2026 |
| No name in the data | EnBW | 300 | CCS2×8 | 09.2026 |
| No name in the data | Network not known | 300 | CCS2×4 | 09.2026 |
| POCO Düren | E-Merge Mobility | 240 | CCS2×4 | 09.2026 |
| EnBW-Ladestation | EnBW | 200 | CCS2×4 | 10.2026 |
| REWE Hürtgenwald, Kreuzstr. 55 | EnBW | 200 | CCS2×2 | 09.2026 |
| Westfalen Tankstelle | Westfalen | 150 | CCS2×2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 50 | CCS2×2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 50 | CCS2×2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 50 | CCS2×2 | 09.2026 |
| Edeka Center Rosenzweig | Network not known | 50 | CCS2×4, CHAdeMO×4, Type 2×4 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 50 | CCS2, Type 2 | 09.2026 |
| Westfalen Charging Station | innogy | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
AC chargers: 93. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Stadtwerke Düren | 49 |
| innogy | 12 |
| Westenergie | 11 |
| EnBW | 7 |
| ALDI SÜD | 4 |
| EWE Go | 2 |
| Fred Pfennings | 2 |
| The Future Drive · on the map | 2 |
| amperio | 2 |
| Bilkraft | 1 |
| E-Merge Mobility | 1 |
| E.ON | 1 |
| Fastned | 1 |
| Kaufland | 1 |
| Lidl | 1 |
| NEW | 1 |
| Pfalzwerke | 1 |
| Westfalen | 1 |
| Wirelane | 1 |
| bp pulse | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 93 | 79% |
| DC 50–149 kW | 8 | 7% |
| 150 kW and more | 17 | 14% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 99 |
| CCS2 | 25 |
| CHAdeMO | 6 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.