EV charging stations in Eschwege, Germany

Data as of 12.11.2026

charging places35
of them public29
public with fast charging (50 kW+)8
known networks10

On the map: 35 charging places from open sources, 29 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 8 locations (28%); 150 kW or more: 4 locations.

55% of the locations are confirmed by two or more sources; 90% were last confirmed in 2025 or 2026.

Without a known network: 9 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.8 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
TotalEnergies Charging SolutionsTotalEnergies400CCS2×1210.2026
EWE Go GmbHEWE Go300CCS2×210.2026
2450CUBOS235CCS2×210.2026
AllegoAllego150CCS2×209.2026
Eschwege - EDEKATEAG50CCS2×210.2026
GlinickeGlinicke50CCS2, Type 209.2026
SUN Stadtwerke Union Nordhessen GmbH & Co. KGSUN Stadtwerke Union Nordhessen50CCS2×209.2026
Sontra - EDEKATEAG50CCS2×210.2026

AC chargers: 19. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC up to 7 kW13%
AC 11–22 kW1862%
DC under 50 kW13%
DC 50–149 kW414%
150 kW and more414%
Power not stated13%

Connectors

ConnectorLocations
Type 220
CCS29
Schuko1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.