EV charging stations in Fürth, Germany
On the map: 131 charging places from open sources, 123 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 24 locations (20%); 150 kW or more: 22 locations.
62% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.
Without a known network: 12 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.0 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Eviny | Tesla | 400 | CCS2×16 | 09.2026 |
| 10024087_Nürnberg | Shell Recharge | 300 | CCS2×2 | 09.2026 |
| Hochstraße | infra fürth | 300 | CCS2×3, CHAdeMO×2 | 10.2026 |
| NSA1 GmbH & Co. KG | Numbat | 300 | CCS2×2 | 09.2026 |
| amperio GmbH (DEAMP) | amperio | 300 | CCS2×2 | 09.2026 |
| No name in the data | Shell Recharge | 300 | CCS2×8 | 09.2026 |
| No name in the data | EnBW | 300 | CCS2×8, Type 2 | 09.2026 |
| Fürth - Karl-Bröger-Straße 32 SLS | infra fürth | 200 | CCS2×2 | 09.2026 |
| Polarstern Energie | N-ERGIE | 200 | CCS2×2 | 09.2026 |
| REWE Nürnberg, Lichtenfelser Straße | EnBW | 200 | CCS2×2 | 10.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 200 | CCS2×6 | 09.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 200 | CCS2×7 | 10.2026 |
| ALDI SÜD | ALDI SÜD | 150 | CCS2×2, Type 2 | 09.2026 |
| Allego | Allego | 150 | CCS2×4 | 09.2026 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| ChargePoint Charging Station | ChargePoint | 150 | CCS2×2 | 09.2026 |
| Fürth - Flößaustraße SLS | infra fürth | 150 | CCS2×2 | 09.2026 |
| Fürth - Hansastraße SLS | infra fürth | 150 | CCS2×2 | 09.2026 |
| Fürth - Norma am Grünen Weg | infra fürth | 150 | CCS2×2 | 09.2026 |
| Kurt-Scherzer-Straße | infra fürth | 150 | CCS2×2, Type 2×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 150 | CCS2×2, Type 2×2 | 09.2026 |
| No name in the data | EnBW | 150 | CCS2×2 | — |
| Fürth - Hintere Straße 38 (EDEKA) | infra fürth | 50 | CCS2×2 | 09.2026 |
| No name in the data | infra fürth | 50 | Type 2×2, CCS2 | 09.2026 |
AC chargers: 97. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| infra fürth | 74 |
| N-ERGIE | 15 |
| Shell Recharge | 4 |
| EnBW | 3 |
| ALDI SÜD | 2 |
| Allego | 2 |
| TotalEnergies | 2 |
| Charge&Fuel | 1 |
| ChargePoint | 1 |
| IKEA | 1 |
| IP Innovative Power · on the map | 1 |
| Numbat | 1 |
| Pfalzwerke | 1 |
| Tesla | 1 |
| amperio | 1 |
| cocharge | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 1% |
| AC 11–22 kW | 96 | 78% |
| DC under 50 kW | 2 | 2% |
| DC 50–149 kW | 2 | 2% |
| 150 kW and more | 22 | 18% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 104 |
| CCS2 | 26 |
| CHAdeMO | 2 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.