EV charging stations in Gersthofen, Germany
On the map: 85 charging places from open sources, 72 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 31 locations (43%); 150 kW or more: 19 locations.
51% of the locations are confirmed by two or more sources; 93% were last confirmed in 2025 or 2026.
Without a known network: 24 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.3 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| No name in the data | Autostrom Plus | 400 | CCS2×6 | — |
| No name in the data | Autostrom Plus | 400 | CCS2×6 | — |
| Audi Augsburg | Network not known | 300 | CCS2×2 | 09.2026 |
| E.ON Drive Infrastructure | E.ON | 300 | CCS2×6 | 10.2026 |
| EWE Go GmbH | EWE Go | 300 | CCS2×4 | 10.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×4 | 10.2026 |
| LEW Natur GmbH | LEW | 300 | CCS2×4 | 09.2026 |
| LEW Natur GmbH | LEW | 300 | CCS2×6 | 09.2026 |
| POTR | Plenitude | 300 | CCS2×8, CHAdeMO×4 | 09.2026 |
| No name in the data | EnBW | 300 | CCS2×4 | 09.2026 |
| Augsburg Supercharger | Tesla | 250 | CCS2×12 | 09.2026 |
| Zusmarshausen Supercharger | Tesla | 250 | CCS2×12 | 09.2026 |
| E.ON Drive GmbH | E.ON | 175 | CCS2×2, CHAdeMO×2 | 09.2026 |
| Euronics XXL Frey & Diessl | EnBW | 160 | CCS2×2 | 10.2026 |
| Jolt Energy GmbH | Jolt | 160 | CCS2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| LEW Natur GmbH | LEW | 150 | CCS2×2 | 09.2026 |
| LEW Natur GmbH | LEW | 150 | CCS2×2 | 09.2026 |
| LEW Natur GmbH | innogy | 150 | CCS2×2 | 09.2026 |
| Schwaba GmbH | Network not known | 75 | CCS2, Type 2 | 09.2026 |
| No name in the data | Network not known | 70 | CCS2×6 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 50 | CCS2×2 | 09.2026 |
| Aichacher Straße 15 | Network not known | 50 | CCS2×2, Type 2 | 09.2026 |
| E.ON Drive Infrastructure | Tank & Rast | 50 | CCS2×2 | 10.2026 |
| E.ON Drive Infrastructure | Tank & Rast | 50 | CCS2×2 | 10.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2×2 | 09.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2×6 | 09.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2×2 | 09.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2×2 | 09.2026 |
| amperio GmbH (DEAMP) | amperio | 50 | CCS2, Type 2 | 09.2026 |
AC chargers: 40. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| LEW | 10 |
| innogy | 9 |
| EnBW | 3 |
| Autostrom Plus | 2 |
| E.ON | 2 |
| EWE Go | 2 |
| Tank & Rast | 2 |
| Tesla | 2 |
| ladenetz.de | 2 |
| ALDI SÜD | 1 |
| CUBOS | 1 |
| E-Wald | 1 |
| Georg Jos. Kaes | 1 |
| IKEA | 1 |
| Jolt | 1 |
| Kaufland | 1 |
| Lidl | 1 |
| Plenitude | 1 |
| Vattenfall InCharge | 1 |
| Wirelane | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 38 | 53% |
| DC under 50 kW | 1 | 1% |
| DC 50–149 kW | 12 | 17% |
| 150 kW and more | 19 | 26% |
| AC, power not stated | 2 | 3% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 43 |
| CCS2 | 32 |
| Schuko | 4 |
| CHAdeMO | 3 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.