EV charging stations in Heppenheim (Bergstraße), Germany
On the map: 66 charging places from open sources, 60 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 14 locations (23%); 150 kW or more: 6 locations.
60% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.
Without a known network: 7 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.3 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Allego | Allego | 300 | CCS2×6 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Raststätte T&R Lorsch West, A67 | EnBW | 300 | CCS2×2 | 10.2026 |
| Hemsbach Supercharger | Tesla | 250 | CCS2×12 | 09.2026 |
| Shell Recharge Charging Station | Shell Recharge | 150 | CCS2×2 | 10.2026 |
| No name in the data | Shell Recharge | 150 | CCS2×2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| A67 BAB Ost | EnBW | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Dr.-Werner-Freyberg-Straße, 69514 Laudenbach | Stadtwerke Weinheim | 50 | CCS2×2, Type 2×2 | 09.2026 |
| Meygo Charge GmbH | Meygo Charge | 50 | CCS2, Type 2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 50 | CCS2, Type 2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 50 | CCS2, Type 2 | 09.2026 |
| Wirelane GmbH | Wirelane | 50 | CCS2×2 | 09.2026 |
AC chargers: 45. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Entega | 14 |
| GGEW | 12 |
| Stadtwerke Weinheim | 8 |
| Pfalzwerke | 3 |
| Shell Recharge | 3 |
| EnBW | 2 |
| LichtBlick · on the map | 2 |
| Allego | 1 |
| IONITY | 1 |
| Lidl | 1 |
| Meygo Charge · on the map | 1 |
| Tesla | 1 |
| Wirelane | 1 |
| bp pulse | 1 |
| deer | 1 |
| ubitricity | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 44 | 73% |
| DC under 50 kW | 1 | 2% |
| DC 50–149 kW | 8 | 13% |
| 150 kW and more | 6 | 10% |
| AC, power not stated | 1 | 2% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 52 |
| CCS2 | 15 |
| CHAdeMO | 3 |
| Schuko | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.