EV charging stations in Hof, Germany
On the map: 113 charging places from open sources, 99 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 28 locations (28%); 150 kW or more: 14 locations.
51% of the locations are confirmed by two or more sources; 90% were last confirmed in 2025 or 2026.
Without a known network: 39 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.8 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Eviny | Bilkraft | 400 | CCS2×8 | 09.2026 |
| No name in the data | EnBW | 400 | CCS2×16 | 09.2026 |
| 10026935_Berg bei Hof | Shell Recharge | 300 | CCS2×2 | 09.2026 |
| Allego | Tesla | 300 | CCS2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 300 | CCS2×2 | 10.2026 |
| Merdedes-Benz High Power Charging Network | Mercedes-Benz | 300 | CCS2×12 | 10.2026 |
| POTR | Plenitude | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| No name in the data | EnBW | 300 | CCS2×4, Type 2 | 09.2026 |
| E.ON Drive Infrastructure | E.ON | 200 | CCS2×4 | 10.2026 |
| EnBW Schnellladestation | EnBW | 200 | CCS2×4 | 09.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 200 | CCS2×4 | 10.2026 |
| E.ON Drive Infrastructure | E.ON | 175 | CCS2, CHAdeMO | 10.2026 |
| Bad Lobenstein - Kurpark | TEAG | 150 | CCS2, Type 2 | 09.2026 |
| Ladestation MediaMarkt | EnBW | 150 | CCS2×2 | 09.2026 |
| Hof - Ludwigstraße 9-11 | N-ERGIE | 100 | CCS2×2 | 09.2026 |
| Rossmann Schwarzenbach an der Saale | EnBW | 100 | CCS2×2 | 10.2026 |
| No name in the data | Energielösung | 100 | CCS2×2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Kaufland | Kaufland | 60 | CCS2×2, Type 2 | 09.2026 |
| Dörnthal 71 | Network not known | 50 | CCS2×2, Type 2×2 | 09.2026 |
| E.ON Drive GmbH | E.ON | 50 | CCS2, CHAdeMO | 09.2026 |
| E.ON Drive GmbH | E.ON | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| EDEKA RENNER | Network not known | 50 | CCS2, Type 2 | 09.2026 |
| EnBW-Ladestation | EnBW | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| Karl-Christian Bruckner | Network not known | 50 | CCS2, Type 2 | 09.2026 |
| Kaufland | Kaufland | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| hypercharget | Energielösung | 50 | CCS2×2 | 09.2026 |
| No name in the data | N-ERGIE | 50 | CCS2, Type 2 | 09.2026 |
AC chargers: 62. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| N-ERGIE | 9 |
| Energielösung | 8 |
| E.ON | 6 |
| EnBW | 6 |
| TEAG | 4 |
| Kaufland | 3 |
| Mer | 3 |
| Wattif | 3 |
| E-Wald | 2 |
| Tesla | 2 |
| Wirelane | 2 |
| Bilkraft | 1 |
| Citywatt | 1 |
| Compleo | 1 |
| CUT! Energy | 1 |
| EWE Go | 1 |
| GETEC mobility solutions | 1 |
| Mercedes-Benz | 1 |
| Plenitude | 1 |
| Sense Electra · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 1% |
| AC 11–22 kW | 57 | 58% |
| DC under 50 kW | 5 | 5% |
| DC 50–149 kW | 14 | 14% |
| 150 kW and more | 14 | 14% |
| AC, power not stated | 4 | 4% |
| DC, power not stated | 1 | 1% |
| Power not stated | 3 | 3% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 71 |
| CCS2 | 34 |
| CHAdeMO | 6 |
| Schuko | 6 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.