EV charging stations in Holzkirchen, Germany

Data as of 12.11.2026

charging places45
of them public38
public with fast charging (50 kW+)9
known networks12

On the map: 45 charging places from open sources, 38 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 9 locations (24%); 150 kW or more: 7 locations.

61% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.

Without a known network: 10 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.4 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Aral Pulsebp pulse300CCS2×4, CHAdeMO×209.2026
Holzkirchen SuperchargerTesla250CCS2×809.2026
Weyarn SuperchargerTesla250CCS2×1609.2026
E.ON Drive InfrastructureIONITY160CCS2, CHAdeMO10.2026
Elektrizitätswerk TegernseeE-Werk Tegernsee150CCS2×209.2026
EnBW-LadestationEnBW150CCS2×210.2026
No name in the dataNetwork not known150Type 2×3, CCS2×2, CHAdeMO09.2026
A8 Raststätte Holzkirchen NordEnBW50CCS2, CHAdeMO, Type 210.2026
Energie Südbayern GmbHEnergie Südbayern50CCS2×209.2026

AC chargers: 25. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC up to 7 kW38%
AC 11–22 kW2258%
DC under 50 kW25%
DC 50–149 kW25%
150 kW and more718%
Power not stated25%

Connectors

ConnectorLocations
Type 228
CCS211
CHAdeMO4
Schuko1

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.