EV charging stations in Holzminden, Germany
On the map: 35 charging places from open sources, 31 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 4 locations (13%); 150 kW or more: 3 locations.
45% of the locations are confirmed by two or more sources; 87% were last confirmed in 2025 or 2026.
Without a known network: 13 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.3 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EWE Go GmbH | EWE Go | 300 | CCS2×2 | 10.2026 |
| Westfalen Weser Ladeservice GmbH | Westfalen Weser Netz | 200 | CCS2×2 | 09.2026 |
| No name in the data | EnBW | 150 | CCS2×4 | 09.2026 |
| Westfalen Weser Ladeservice GmbH | Westfalen Weser Netz | 50 | CCS2×2 | 09.2026 |
AC chargers: 25. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Westfalen Weser Netz | 10 |
| EWE Go | 1 |
| EnBW | 1 |
| innogy | 1 |
| Lidl | 1 |
| Plugsurfing | 1 |
| RheinEnergie | 1 |
| Stromnetz Hamburg | 1 |
| Weller | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 4 | 13% |
| AC 11–22 kW | 21 | 68% |
| DC 50–149 kW | 1 | 3% |
| 150 kW and more | 3 | 10% |
| Power not stated | 2 | 6% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 24 |
| CCS2 | 4 |
| Schuko | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.