EV charging stations in Kamp-Lintfort, Germany
On the map: 24 charging places from open sources, 21 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 5 locations (24%); 150 kW or more: 4 locations.
57% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.
Without a known network: 5 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.4 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EHT_64829_01 | EWE Go | 400 | CCS2×12 | 10.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×4, Type 2 | 10.2026 |
| No name in the data | Shell Recharge | 300 | CCS2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| No name in the data | Network not known | 75 | CCS2×2, Type 2×2 | 09.2026 |
AC chargers: 15. They are not listed one by one here; the map shows them all. AC chargers on the map
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 15 | 71% |
| DC 50–149 kW | 1 | 5% |
| 150 kW and more | 4 | 19% |
| Power not stated | 1 | 5% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 17 |
| CCS2 | 5 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.