EV charging stations in Landsberg am Lech, Germany
On the map: 117 charging places from open sources, 101 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 22 locations (22%); 150 kW or more: 8 locations.
50% of the locations are confirmed by two or more sources; 94% were last confirmed in 2025 or 2026.
Without a known network: 29 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.2 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Aral Pulse | bp pulse | 400 | CCS2×8 | 09.2026 |
| ionity | IONITY | 350 | CCS2×4 | 11.2023 |
| EnBW-Ladestation | EnBW | 300 | CCS2×8, Type 2 | 10.2026 |
| Gewerbestr Nord 19 | EnBW | 300 | CCS2×4 | 10.2026 |
| NSA1 GmbH & Co. KG | Numbat | 300 | CCS2×2 | 09.2026 |
| Energie Südbayern GmbH | Energie Südbayern | 150 | CCS2, Type 2 | 09.2026 |
| MER Germany | E-Wald | 150 | CCS2×2 | 10.2026 |
| No name in the data | BayWa Mobility Solutions | 150 | CCS2×2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 09.2026 |
| Autobahnraststätte Lechwiesen Nord | innogy | 50 | CHAdeMO, Type 2, CCS2 | — |
| Autohaus Medele & Geyer | ChargeIT mobility | 50 | Type 2×9, CCS2×2 | 09.2026 |
| E.ON Drive Infrastructure | IONITY | 50 | CCS2×2 | 10.2026 |
| E.ON Drive Infrastructure | E.ON | 50 | CCS2×2 | 10.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| LEW Natur GmbH | LEW | 50 | CCS2×2, Type 2×2 | 09.2026 |
| LEW Natur GmbH | innogy | 50 | CCS2×2 | 09.2026 |
| Landsberg am Lech - Am Englischen Garten 1 | Energieversorgung Landsberg | 50 | CCS2 | 09.2026 |
| Landsberg am Lech - Bayerfeldstr. ggü. Nr. 19 | Energieversorgung Landsberg | 50 | CCS2×2 | 09.2026 |
| Landsberg am Lech - Münchner Straße Nähe 34 | Energieversorgung Landsberg | 50 | CCS2×2 | 09.2026 |
| Lidl | Lidl | 50 | Type 2×4, CCS2, CHAdeMO | 09.2026 |
| Präg Strom | PRÄG | 50 | CCS2×4 | 09.2026 |
| No name in the data | Network not known | 50 | Type 2×8, CCS2×2 | 09.2026 |
AC chargers: 75. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Energieversorgung Landsberg | 16 |
| LEW | 13 |
| innogy | 6 |
| Georg Jos. Kaes | 4 |
| SWE Stadtwerke Erfurt | 4 |
| Ladelösungen Fürstenfeldbruck | 3 |
| ALDI SÜD | 2 |
| E.ON | 2 |
| EnBW | 2 |
| IONITY | 2 |
| Lidl | 2 |
| Augustinum · on the map | 1 |
| BayWa Mobility Solutions | 1 |
| CUBOS | 1 |
| ChargeIT mobility | 1 |
| E-Wald | 1 |
| Energie Südbayern | 1 |
| Numbat | 1 |
| PRÄG | 1 |
| Pfalzwerke | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 75 | 74% |
| DC under 50 kW | 3 | 3% |
| DC 50–149 kW | 14 | 14% |
| 150 kW and more | 8 | 8% |
| Power not stated | 1 | 1% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 86 |
| CCS2 | 24 |
| CHAdeMO | 3 |
| Schuko | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.