EV charging stations in Löbau, Germany

Data as of 12.11.2026

charging places41
of them public35
public with fast charging (50 kW+)9
known networks12

On the map: 41 charging places from open sources, 35 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 9 locations (26%); 150 kW or more: 4 locations.

69% of the locations are confirmed by two or more sources; 80% were last confirmed in 2025 or 2026.

Without a known network: 10 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.6 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Circle K DeutschlandCircle K175CCS2×2, CHAdeMO×209.2026
Adam-Ries-Straße 4SachsenEnergie150CCS2×2, Type 209.2026
Comfort ChargeComfortcharge150CCS2×2, Type 2×209.2026
Comfortcharge LadestationComfortcharge150CCS2×2, Type 205.2025
No name in the dataE-Merge Mobility99CCS2×209.2026
EDEKA LöbauEDEKA50CCS2, Type 209.2026
KauflandKaufland50CCS2×2, Type 209.2026
VW Autohaus ElitzschVolkswagen50Type 2, CCS211.2015
No name in the dataVolkswagen50Type 2, CCS2—

AC chargers: 20. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW2057%
DC under 50 kW13%
DC 50–149 kW514%
150 kW and more411%
Power not stated514%

Connectors

ConnectorLocations
Type 228
CCS210
CHAdeMO1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.