EV charging stations in Meppen, Germany
On the map: 71 charging places from open sources, 64 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 18 locations (28%); 150 kW or more: 9 locations.
42% of the locations are confirmed by two or more sources; 92% were last confirmed in 2025 or 2026.
Without a known network: 25 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.8 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EHT_64805_01 | EWE Go | 400 | CCS2×4 | 10.2026 |
| No name in the data | Network not known | 400 | CCS2×2 | 09.2026 |
| E.ON Drive Infrastructure | E.ON | 300 | CCS2×6 | 10.2026 |
| EnBW-Ladestation | EnBW | 300 | CCS2×8, Type 2 | 10.2026 |
| Raming Biogas GmbH & Co.KG | Network not known | 300 | CCS2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 200 | CCS2×4 | 10.2026 |
| ALDI Nord | ALDI | 150 | CCS2×2 | 09.2026 |
| E.ON Drive Infrastructure | E.ON | 150 | CCS2×4 | 10.2026 |
| nvb High Power Schnellladestation Am Neuen Markt Meppen | innogy | 150 | CCS2×2 | 09.2026 |
| Fürstenbergstraße 7 | EnBW | 75 | CCS2×2, CHAdeMO | 10.2026 |
| ALDI Nord | ALDI | 50 | CCS2×2 | 09.2026 |
| Auf der Herrschwiese 5-9 | EnBW | 50 | Type 2, CCS2, CHAdeMO | 07.2021 |
| Bruns MSR-Technik GmbH | Network not known | 50 | CCS2 | 09.2026 |
| nvb Schnellladestation Eppe Teglingen | nvb Nordhorn | 50 | CCS2×2 | 09.2026 |
| nvb Schnellladestation Kiek in de Pann Twist | nvb Nordhorn | 50 | CCS2×2 | 09.2026 |
| No name in the data | EDEKA | 50 | CCS2, Type 2 | 09.2026 |
| No name in the data | EDEKA | 50 | CCS2×2, Type 2×2 | 09.2026 |
| No name in the data | nvb Nordhorn | 50 | CCS2×2 | 09.2026 |
AC chargers: 43. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| innogy | 8 |
| nvb Nordhorn | 8 |
| EDEKA | 3 |
| EnBW | 3 |
| Westenergie | 3 |
| ALDI | 2 |
| BACKCHARGE | 2 |
| E.ON | 2 |
| EWE Go | 2 |
| Allego | 1 |
| Charge Construct · on the map | 1 |
| Pluq | 1 |
| SWB / EWE | 1 |
| Tesla | 1 |
| ladenetz.de | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 2% |
| AC 11–22 kW | 40 | 63% |
| DC under 50 kW | 3 | 5% |
| DC 50–149 kW | 9 | 14% |
| 150 kW and more | 9 | 14% |
| AC, power not stated | 2 | 3% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 48 |
| CCS2 | 21 |
| Schuko | 8 |
| CHAdeMO | 2 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.