EV charging stations in Mössingen, Germany

Data as of 12.11.2026

charging places33
of them public23
public with fast charging (50 kW+)5
known networks11

On the map: 33 charging places from open sources, 23 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 5 locations (22%); 150 kW or more: 3 locations.

65% of the locations are confirmed by two or more sources; 91% were last confirmed in 2025 or 2026.

Without a known network: 7 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.2 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
EWE Go GmbHEWE Go300CCS2×210.2026
Pfalzwerke AGPfalzwerke300CCS2×209.2026
REWE Dußlingen, BlumenstraßeEnBW200CCS2×610.2026
EnBW-LadestationEnBW100CCS2×210.2026
Beim Holzplatz RÖWA reinNetwork not known50CCS2×209.2026

AC chargers: 17. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

Locations by maximum power

PowerLocationsShare
AC 11–22 kW1670%
DC under 50 kW14%
DC 50–149 kW29%
150 kW and more313%
AC, power not stated14%

Connectors

ConnectorLocations
Type 217
CCS26
Schuko2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.