EM1 charging stations in Germany
On the map: 33 charging places from open sources, 33 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 8 cities in Germany; it is <1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 13 locations (39%); 150 kW or more: 3 locations.
42% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Mühldorf am Inn | 9 |
| Rosenheim | 8 |
| Traunstein | 3 |
| Burghausen | 3 |
| Waldkraiburg | 1 |
| Penzberg | 1 |
| Husum | 1 |
| Ahrensburg | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 20 | 61% |
| DC 50–149 kW | 10 | 30% |
| 150 kW and more | 3 | 9% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 26 |
| CCS2 | 13 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.