EV charging stations in Nottuln, Germany
On the map: 47 charging places from open sources, 36 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 5 locations (14%); 150 kW or more: 4 locations.
67% of the locations are confirmed by two or more sources; 92% were last confirmed in 2025 or 2026.
Without a known network: 12 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.4 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EnBW HyperNetz | EnBW | 400 | CCS2×8 | 10.2026 |
| EWE Go GmbH | Tesla | 300 | CCS2×4 | 10.2026 |
| Aral Pulse | bp pulse | 150 | CCS2×2 | 09.2026 |
| No name in the data | Westfalen | 150 | CCS2×2 | 09.2026 |
| hagebaumarkt Frieling Nottuln | EnBW | 100 | CCS2×2 | 10.2026 |
AC chargers: 28. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| GFC | 9 |
| ladenetz.de | 5 |
| EnBW | 2 |
| Westfalen | 2 |
| innogy | 1 |
| Shell Recharge | 1 |
| Stadtwerke Lünen · on the map | 1 |
| Tesla | 1 |
| TotalEnergies | 1 |
| bp pulse | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 3% |
| AC 11–22 kW | 27 | 75% |
| DC under 50 kW | 2 | 6% |
| DC 50–149 kW | 1 | 3% |
| 150 kW and more | 4 | 11% |
| Power not stated | 1 | 3% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 30 |
| CCS2 | 7 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.