EV charging stations in Preetz, Germany

Data as of 12.11.2026

charging places38
of them public34
public with fast charging (50 kW+)6
known networks11

On the map: 38 charging places from open sources, 34 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 6 locations (18%); 150 kW or more: 5 locations.

44% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.

Without a known network: 10 locations.

Fast DC chargers from 50 kW per 10 public locations: 1.8 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
NORDENERGIE Ladestation PreetzNetwork not known400CCS2×210.2026
NORDENERGIE Ladestation SelentNetwork not known400CCS2×210.2026
autostrom.plusAutostrom Plus400CCS2×409.2026
EnBW-LadestationEnBW150CCS2×210.2026
EnBW-LadestationEnBW150CCS2×210.2026
Stadtwerke Plön Versorgungs GmbHStadtwerke Plön50CCS2×4, Type 2×409.2026

AC chargers: 26. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW2676%
DC under 50 kW26%
DC 50–149 kW13%
150 kW and more515%

Connectors

ConnectorLocations
Type 229
CCS28

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.