EV charging stations in Quedlinburg, Germany

Data as of 12.11.2026

charging places23
of them public19
public with fast charging (50 kW+)9
known networks9

On the map: 23 charging places from open sources, 19 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 9 locations (47%); 150 kW or more: 8 locations.

53% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.

Without a known network: 8 locations.

Fast DC chargers from 50 kW per 10 public locations: 4.7 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Circle K DeutschlandCircle K400CCS2×6, CHAdeMO09.2026
EWE Go GmbHEWE Go300CCS2×809.2026
MoorhofNetwork not known220CCS2×209.2026
DC-10017-01ORLEN Charge200CCS2×209.2026
Vattenfall InChargeVattenfall InCharge175CCS2×209.2026
EnBW HyperNetzEnBW150CCS2×209.2026
Ladestation HellwegEnBW150CCS2×210.2026
Ladestation WeyhegartenEnBW150CCS2×210.2026
KauflandKaufland50CCS2, Type 209.2026

AC chargers: 8. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW842%
DC under 50 kW15%
DC 50–149 kW15%
150 kW and more842%
Power not stated15%

Connectors

ConnectorLocations
CCS210
Type 210
CHAdeMO1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.