EV charging stations in Rastede, Germany

Data as of 12.11.2026

charging places24
of them public21
public with fast charging (50 kW+)6
known networks4

On the map: 24 charging places from open sources, 21 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 6 locations (29%); 150 kW or more: 3 locations.

52% of the locations are confirmed by two or more sources; 90% were last confirmed in 2025 or 2026.

Without a known network: 10 locations.

Fast DC chargers from 50 kW per 10 public locations: 2.9 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
AllegoAllego300CCS2×409.2026
EWE Go GmbHEWE Go200CCS2×209.2026
E.ON Drive InfrastructureE.ON150CCS2×410.2026
EWE Go GmbHEWE Go50CCS2×209.2026
EWE Go GmbHEWE Go50CCS2×409.2026
EWE Go GmbHEWE Go50CCS2×410.2026

AC chargers: 15. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

NetworkLocations
EWE Go7
SWB / EWE2
Allego1
E.ON1

Locations by maximum power

PowerLocationsShare
AC 11–22 kW1362%
DC 50–149 kW314%
150 kW and more314%
AC, power not stated210%

Connectors

ConnectorLocations
Type 213
CCS26
Schuko2

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.