EV charging stations in Rotenburg (Wümme), Germany
On the map: 90 charging places from open sources, 83 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 29 locations (35%); 150 kW or more: 19 locations.
43% of the locations are confirmed by two or more sources; 99% were last confirmed in 2025 or 2026.
Without a known network: 22 locations.
Fast DC chargers from 50 kW per 10 public locations: 3.5 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| A1 AS50 Sottrum, Carl-von-Linde-Str. 6 | Tesla | 400 | CCS2×20 | 10.2026 |
| EWE Go GmbH | EWE Go | 400 | CCS2×8 | 10.2026 |
| Eviny | Bilkraft | 400 | CCS2×8 | 09.2026 |
| REWE Sittensen, Stader Str. 28 | Tesla | 400 | CCS2×12 | 10.2026 |
| 13008236_Gyhum | Shell Recharge | 300 | CCS2×2 | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×14 | 09.2026 |
| MER Germany | Mer | 300 | CCS2×2 | 10.2026 |
| Shell Ladestation | Allego | 300 | CCS2×8 | 09.2026 |
| Comfortcharge Ladestation | Comfortcharge | 200 | CCS2×2 | 04.2025 |
| EWE Go GmbH | EWE Go | 200 | CCS2×2 | 10.2026 |
| Vattenfall InCharge | Vattenfall InCharge | 180 | CCS2×2 | 09.2026 |
| ALDI Nord | ALDI | 150 | CCS2×2 | 09.2026 |
| EWE Go GmbH | SWB / EWE | 150 | CCS2×2 | 10.2026 |
| Penny Ladestation | EnBW | 150 | CCS2×2 | 10.2026 |
| Stadtwerke Rotenburg (Wümme) | Stadtwerke Rotenburg (Wümme) | 150 | CCS2×2 | 09.2026 |
| Stadtwerke Rotenburg (Wümme) | Stadtwerke Rotenburg (Wümme) | 150 | CCS2×2 | 09.2026 |
| No name in the data | EDEKA | 150 | CCS2×2, Type 2 | 09.2026 |
| No name in the data | Stadtwerke Zeven | 150 | CCS2×2 | 09.2026 |
| Euronics XXL Zeven | EnBW | 100 | CCS2×2 | 10.2026 |
| Lidl | Lidl | 60 | CCS2×2 | 09.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 10.2026 |
| ALDI Nord | ALDI | 50 | CCS2×2 | 09.2026 |
| ALP | Volkswagen | 50 | CCS2×2, Type 2×2 | 09.2026 |
| EWE Go GmbH | EWE Go | 50 | CCS2×2 | 10.2026 |
| Ladesonne | Ladesonne | 50 | CCS2×2 | 09.2026 |
| Lidl | Lidl | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| TotalEnergies Charging Solutions | TotalEnergies | 50 | CCS2, Type 2 | 09.2026 |
| amperio GmbH (DEAMP) | amperio | 50 | Type 2×3, CCS2 | 09.2026 |
AC chargers: 51. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| EWE Go | 8 |
| Stadtwerke Rotenburg (Wümme) · on the map | 8 |
| Rotenburger Werke · on the map | 7 |
| Stadtwerke Zeven · on the map | 6 |
| SWB / EWE | 4 |
| Lidl | 3 |
| Wirelane | 3 |
| ALDI | 2 |
| EnBW | 2 |
| Tesla | 2 |
| bp pulse | 2 |
| Allego | 1 |
| Autohaus Neustadt Schmidt + Koch · on the map | 1 |
| Bilkraft | 1 |
| Citywatt | 1 |
| Comfortcharge | 1 |
| EDEKA | 1 |
| Ladesonne | 1 |
| Mer | 1 |
| Mercedes-Benz | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 1% |
| AC 11–22 kW | 50 | 60% |
| DC under 50 kW | 3 | 4% |
| DC 50–149 kW | 10 | 12% |
| 150 kW and more | 19 | 23% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 59 |
| CCS2 | 32 |
| CHAdeMO | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.