EV charging stations in Rottweil, Germany
On the map: 51 charging places from open sources, 45 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 19 locations (42%); 150 kW or more: 10 locations.
51% of the locations are confirmed by two or more sources; 93% were last confirmed in 2025 or 2026.
Without a known network: 9 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.2 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Pfalzwerke AG | Pfalzwerke | 400 | CCS2×2 | 09.2026 |
| Neckarburg Ost | IONITY | 350 | CCS2×6 | 10.2026 |
| Neckarburg West | IONITY | 350 | CCS2×6 | 10.2026 |
| Mainova AG | Mainova | 300 | CCS2×2 | 09.2026 |
| Pfalzwerke AG | Pfalzwerke | 300 | CCS2×2 | 09.2026 |
| hagebaumarkt Bolay | EnBW | 300 | CCS2×4 | 10.2026 |
| Comfort Charge | Comfortcharge | 200 | CCS2×2 | 09.2026 |
| No name in the data | EnBW | 200 | CCS2×6 | — |
| ALDI SÜD | ALDI SÜD | 150 | CCS2×2, Type 2 | 09.2026 |
| Comfort Charge | Comfortcharge | 150 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| 78727 Oberndorf am Neckar, Sägewerkstraße 6 | EnBW | 100 | CCS2×2 | 10.2026 |
| Euronics XXL Rottweil | EnBW | 93 | CCS2×2 | 09.2026 |
| naturenergie | Naturenergie | 75 | CCS2×2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 62 | CCS2×2, Type 2 | 09.2026 |
| ALDI SÜD | ALDI SÜD | 50 | CCS2×2 | 09.2026 |
| Kaufland | Kaufland | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Kaufland | Kaufland | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| Team-Emobility GmbH | EnBW | 50 | Type 2×11, CCS2 | 10.2026 |
| No name in the data | ALDI | 50 | CCS2×2 | — |
AC chargers: 22. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| EnBW | 13 |
| ALDI SÜD | 3 |
| Comfortcharge | 2 |
| IONITY | 2 |
| Kaufland | 2 |
| Naturenergie | 2 |
| Pfalzwerke | 2 |
| cocharge | 2 |
| deer | 2 |
| ALDI | 1 |
| B+B Parkhaus · on the map | 1 |
| Mainova | 1 |
| Pariamus | 1 |
| badenova | 1 |
| bike energy | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 22 | 49% |
| DC under 50 kW | 3 | 7% |
| DC 50–149 kW | 9 | 20% |
| 150 kW and more | 10 | 22% |
| Power not stated | 1 | 2% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 30 |
| CCS2 | 22 |
| Schuko | 7 |
| CHAdeMO | 3 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.