EV charging stations in Seevetal, Germany
On the map: 119 charging places from open sources, 104 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 26 locations (25%); 150 kW or more: 20 locations.
71% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.
Without a known network: 8 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.5 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| EHT_14134_1 | EWE Go | 400 | CCS2×2 | 10.2026 |
| Pfalzwerke AG | Pfalzwerke | 400 | CCS2×2 | 09.2026 |
| Bremer Straße 112 | Shell Recharge | 360 | CCS2×4, CHAdeMO×4 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×2 | 10.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×6 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4 | 09.2026 |
| Aral Pulse | bp pulse | 300 | CCS2×4, CHAdeMO×2 | 09.2026 |
| Citywatt GmbH | Allego | 300 | CCS2×2 | 10.2026 |
| E.ON Drive Infrastructure | E.ON | 300 | CCS2×2 | 10.2026 |
| E.ON Drive Infrastructure | E.ON | 300 | CCS2×4 | 09.2026 |
| Rewe Ladestation | EnBW | 300 | CCS2×4, Type 2 | 10.2026 |
| Rewe Ladestation | EnBW | 300 | CCS2×8, Type 2 | 10.2026 |
| Shell Ladestation | Shell Recharge | 300 | CCS2×4 | 10.2026 |
| Telekom Ladestation | Comfortcharge | 200 | CCS2×2 | 05.2025 |
| Allego | Allego | 150 | CCS2×2 | 09.2026 |
| EWE Go GmbH | SWB / EWE | 150 | CCS2×2 | 10.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| HEnW-Mobil | Hamburger Energiewerke | 150 | CCS2×2 | 09.2026 |
| Hasselhöhe West Ladestation | EnBW | 150 | CCS2×2, CHAdeMO | 10.2026 |
| Seevetal Ost Ladestation | EnBW | 150 | CCS2×2, CHAdeMO | 10.2026 |
| Lidl | Lidl | 60 | CCS2×2, Type 2 | 10.2026 |
| Allego | Tesla | 53 | Type 2×5, CCS2 | 09.2026 |
| Allego | Allego | 50 | CCS2, CHAdeMO, Type 2 | 09.2026 |
| EWE Go GmbH | SWB / EWE | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
| Volkswagen Automobile | Network not known | 50 | Type 2, CCS2 | 10.2015 |
| Winsener Straße 36 | Stromnetz Hamburg | 50 | CHAdeMO, Type 2, CCS2 | 07.2021 |
AC chargers: 78. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Stromnetz Hamburg | 21 |
| Hamburger Energiewerke | 17 |
| eze.network | 7 |
| EWE Go | 5 |
| E.ON | 4 |
| EnBW | 4 |
| Westfalen Weser Netz | 4 |
| Wirelane | 4 |
| bp pulse | 4 |
| ubitricity | 4 |
| Allego | 3 |
| Shell Recharge | 3 |
| Lidl | 2 |
| Qwello | 2 |
| SWB / EWE | 2 |
| Stadtwerke Winsen (Luhe) · on the map | 2 |
| Buchholz Digital · on the map | 1 |
| Charge Construct · on the map | 1 |
| Comfortcharge | 1 |
| NWG Charging · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 1% |
| AC 11–22 kW | 77 | 74% |
| DC 50–149 kW | 6 | 6% |
| 150 kW and more | 20 | 19% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 85 |
| CCS2 | 26 |
| CHAdeMO | 7 |
| Schuko | 2 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.