EV charging stations in Sonneberg, Germany
On the map: 54 charging places from open sources, 49 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 16 locations (33%); 150 kW or more: 5 locations.
57% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 12 locations.
Fast DC chargers from 50 kW per 10 public locations: 3.3 here, 2.2 on average across Germany.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Regioladen+ | RegioLaden | 300 | CCS2×2 | 10.2026 |
| ChargeOne | CUBOS | 235 | CCS2×2 | 10.2026 |
| EWE Go GmbH | EWE Go | 150 | CCS2×2 | 10.2026 |
| KBN GmbH | KBN Neustadt | 150 | CCS2×3, Type 2 | 09.2026 |
| Neuhaus am Rennweg - Autohaus Rennsteig | TEAG | 150 | CCS2×2 | 10.2026 |
| KBN GmbH | KBN Neustadt | 50 | CCS2, Type 2 | 09.2026 |
| Lidl | Lidl | 50 | Type 2×4, CCS2, CHAdeMO | 09.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2, Type 2 | 09.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2×4, Type 2×4 | 10.2026 |
| Regioladen+ | ladenetz.de | 50 | CCS2, Type 2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2, Type 2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2×2, Type 2×2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2, Type 2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2×2, Type 2×2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2, Type 2 | 10.2026 |
| Regioladen+ | RegioLaden | 50 | CCS2×3, Type 2×3 | 10.2026 |
AC chargers: 32. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| RegioLaden | 12 |
| KBN Neustadt · on the map | 8 |
| TEAG | 3 |
| ladenetz.de | 3 |
| Citywatt | 2 |
| E.ON | 2 |
| Energielösung | 2 |
| innogy | 2 |
| CUBOS | 1 |
| EWE Go | 1 |
| Lidl | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 2% |
| AC 11–22 kW | 31 | 63% |
| DC under 50 kW | 1 | 2% |
| DC 50–149 kW | 11 | 22% |
| 150 kW and more | 5 | 10% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 45 |
| CCS2 | 17 |
| CHAdeMO | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.