Data as of 12.11.2026

charging places50
of them public43
public with fast charging (50 kW+)2
known networks11

On the map: 50 charging places from open sources, 43 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 2 locations (5%); 150 kW or more: 2 locations.

58% of the locations are confirmed by two or more sources; 93% were last confirmed in 2025 or 2026.

Without a known network: 19 locations.

Fast DC chargers from 50 kW per 10 public locations: 0.5 here, 2.2 on average across Germany.

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
FirstchargeNetwork not known300CCS2×209.2026
TotalEnergies Charging SolutionsTotalEnergies200CCS2×410.2026

AC chargers: 37. They are not listed one by one here; the map shows them all. AC chargers on the map

Locations by maximum power

PowerLocationsShare
AC 11–22 kW3786%
DC under 50 kW12%
150 kW and more25%
Power not stated37%

Connectors

ConnectorLocations
Type 238
Schuko6
CCS23