EV charging stations in Ioannina, Greece
On the map: 78 charging places from open sources, 77 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 17 locations (22%); 150 kW or more: 6 locations.
83% of the locations are confirmed by two or more sources; 87% were last confirmed in 2025 or 2026.
Without a known network: 10 locations.
Fast DC chargers from 50 kW per 10 public locations: 2.2 here, 1.8 on average across Greece.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Top Parks Ioannina | PPC blue | 300 | Type 2×8, CCS2×4 | 03.2026 |
| Ioannina Supercharger | Tesla | 250 | CCS2×6 | 06.2025 |
| Shell 185 | nrg incharge | 180 | CCS2×2 | 03.2026 |
| Volvo-Maxx Motors - Car Dealer | ElpeFuture | 175 | CCS2×2 | 03.2026 |
| G008 AB Ioannina 3 | AB Vassilopoulos | 150 | Type 2×6, CCS2×2 | 03.2026 |
| G344 AB Ioannina Anatoli | AB Vassilopoulos | 150 | Type 2×8, CCS2×2 | 03.2026 |
| BP Kalypso R164 - Ioannina | ElpeFuture | 80 | CCS2×2 | 03.2026 |
| 048 Sklavenitis Ioannina | PPC blue | 60 | Type 2×12, CCS2×6 | 03.2026 |
| AVIN 4161 | nrg incharge | 60 | Type 2×2, CCS2, CHAdeMO | 03.2026 |
| Grand Masoutis Ioannina | Electrip | 60 | CCS2×4 | 03.2026 |
| Shell 109 | nrg incharge | 60 | CCS2, CHAdeMO, Type 2 | 03.2026 |
| Sklavenitis Paralimnio | PPC blue | 60 | CCS2×2, Type 2×2 | 03.2026 |
| nrg - AVIN | Network not known | 60 | CHAdeMO, Type 2, CCS2 | — |
| nrg - Shell 116 | Network not known | 60 | CCS2×2 | — |
| AVIN 4133 | nrg incharge | 50 | CCS2, CHAdeMO, Type 2 | 03.2026 |
| BP Kalypso R161 - Ioannina | ElpeFuture | 50 | CCS2, CHAdeMO, Type 2 | 03.2026 |
| elin Italmetano - Ioannina | PPC blue | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 03.2026 |
AC chargers: 56. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| nrg incharge | 18 |
| PPC blue | 14 |
| Watt+Volt | 8 |
| Joltie | 6 |
| Protergia | 5 |
| EV Loader | 4 |
| ElpeFuture | 4 |
| AB Vassilopoulos | 2 |
| Blink | 1 |
| ChargePlus | 1 |
| Electrip | 1 |
| Fortisis | 1 |
| Open Mobility · on the map | 1 |
| Tesla · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 1% |
| AC 11–22 kW | 55 | 71% |
| DC under 50 kW | 4 | 5% |
| DC 50–149 kW | 11 | 14% |
| 150 kW and more | 6 | 8% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 68 |
| CCS2 | 21 |
| CHAdeMO | 6 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.