EV charging stations in Karawang, Indonesia
On the map: 12 charging places from open sources, 12 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 4 locations (33%); 150 kW or more: 1 location.
0% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 3.3 here, 4.1 on average across Indonesia.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Rest Area KM 57 A Tol Jakarta Cikampek | PLN | 200 | CCS2×4, Type 2 | 03.2026 |
| (iGREEN+) Rest Area BYD KM 57 A Tol Jakarta Cikampek | Network not known | 120 | CCS2×6 | 03.2026 |
| Rest Area KM 42 B Tol Jakarta Cikampek | PLN | 60 | CCS2×2, CHAdeMO×2, Type 2×2 | 03.2026 |
| The Manor Surya Cipta | CHARGE+ | 60 | CCS2×2, Type 2×2 | 03.2026 |
AC chargers: 4. They are not listed one by one here; the map shows them all. AC chargers on the map
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 4 | 33% |
| DC under 50 kW | 4 | 33% |
| DC 50–149 kW | 3 | 25% |
| 150 kW and more | 1 | 8% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 11 |
| CCS2 | 8 |
| CHAdeMO | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
| Source | Licence | Locations |
|---|---|---|
| Open Charge Map | CC BY 4.0 (provider licence shown on the point card) | 12 |
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.