On the map: 14 charging places from open sources, 14 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (14%); 150 kW or more: 0 locations.
0% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 1.4 here, 4.1 on average across Indonesia.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Dinas Perhubungan NTB | PLN | 60 | CCS2, CHAdeMO, Type 2 | 03.2026 |
| Hotel Santika Mataram | PLN | 50 | CCS2, CHAdeMO, Type 2 | 03.2026 |
AC chargers: 10. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| PLN | 14 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 7% |
| AC 11–22 kW | 9 | 64% |
| DC under 50 kW | 2 | 14% |
| DC 50–149 kW | 2 | 14% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 14 |
| CCS2 | 4 |
| CHAdeMO | 4 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
| Source | Licence | Locations |
|---|---|---|
| Open Charge Map | CC BY 4.0 (provider licence shown on the point card) | 14 |