EV charging stations in Cantù, Italy

Data as of 12.11.2026

charging places21
of them public18
public with fast charging (50 kW+)2
known networks5

On the map: 21 charging places from open sources, 18 of them public. Not every charger that exists; places with reliability below 40 are not included.

Fast DC charging from 50 kW: 2 locations (11%); 150 kW or more: 1 location.

28% of the locations are confirmed by two or more sources; 11% were last confirmed in 2025 or 2026.

Without a known network: 2 locations.

Fast DC chargers from 50 kW per 10 public locations: 1.1 here, 2.7 on average across Italy.

Open data cover only part of the chargers here. Source

Fast chargers (DC from 50 kW)

Fast chargers on the map
LocationNetworkkWConnectorLast confirmed
Free To XFree To X300CCS2×9, CHAdeMO, Type 210.2026
Tigros di Cermenate, Via XXV Aprile 48-50Powy100Type 2×2, CCS2×210.2026

AC chargers: 4. They are not listed one by one here; the map shows them all. AC chargers on the map

Networks

Locations by maximum power

PowerLocationsShare
AC 11–22 kW422%
DC 50–149 kW16%
150 kW and more16%
Power not stated1267%

Connectors

ConnectorLocations
Type 26
CCS22
CHAdeMO1

Sources and licences

Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.

Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.