EV charging stations in Desenzano del Garda, Italy
On the map: 44 charging places from open sources, 26 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 11 locations (42%); 150 kW or more: 1 location.
58% of the locations are confirmed by two or more sources; 58% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.2 here, 2.7 on average across Italy.
Open data cover only part of the chargers here. Source
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| IPlanet ads IP Monte Alto Sud | iPlanet | 300 | CCS2×2 | 11.2025 |
| ELECTRIEASE ADS Montealto Ovest | Nextcharge | 100 | CCS2×2 | 11.2025 |
| EWiva Località Sermana | Ewiva | 100 | CCS2 | 09.2023 |
| Electriease | Nextcharge | 100 | CCS2×2 | 06.2025 |
| ENEL X Tangenziale Peschiera Del Garda | Enel X Way | 75 | Type 2×3, CCS2, CHAdeMO | 06.2024 |
| A2A Piazza Virgilio | a2a emoving | 50 | CCS2, CHAdeMO, Type 2 | 06.2024 |
| A2A Via San Vito | a2a emoving | 50 | CCS2, CHAdeMO, Type 2 | 06.2024 |
| BERGOMI CAR Via Giulio Natta Cunettone-villa | Nextcharge | 50 | CCS2, CHAdeMO, Type 2 | 06.2024 |
| DESENZANO_PISCINE | Neogy | 50 | CCS2×2, CHAdeMO, Type 2 | 11.2026 |
| Due Pini | A2A FAST parcheggio Conad | E-moving | 50 | CCS2, CHAdeMO, Type 2 | 06.2024 |
| SALO_MERCATO | Neogy | 50 | Type 2×3, CCS2×2, CHAdeMO | 11.2026 |
AC chargers: 13. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| GardaUno · on the map | 8 |
| Nextcharge | 3 |
| Enel X Way | 2 |
| Lidl · on the map | 2 |
| Neogy | 2 |
| a2a emoving | 2 |
| E-moving · on the map | 1 |
| Ewiva | 1 |
| iPlanet · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 5 | 19% |
| AC 11–22 kW | 5 | 19% |
| DC 50–149 kW | 10 | 38% |
| 150 kW and more | 1 | 4% |
| AC, power not stated | 3 | 12% |
| Power not stated | 2 | 8% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 20 |
| CCS2 | 11 |
| CHAdeMO | 7 |
| Type 3 | 2 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.