DAEN Mobility charging stations in the Netherlands
On the map: 260 charging places from open sources, 260 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 129 cities in the Netherlands; it is 1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 0 locations (0%); 150 kW or more: 0 locations.
7% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Drachten | 7 |
| Helmond | 6 |
| Emmen | 6 |
| Leeuwarden | 5 |
| Eindhoven | 5 |
| Amersfoort | 5 |
| Aalsmeer | 5 |
| Wijchen | 4 |
| Tilburg | 4 |
| Oss | 4 |
| Oldenzaal | 4 |
| Nuenen | 4 |
| Maarssen | 4 |
| Groningen | 4 |
| Assen | 4 |
| Woerden | 3 |
| Valkenswaard | 3 |
| Sneek | 3 |
| Sittard | 3 |
| 's-Hertogenbosch | 3 |
| Roermond | 3 |
| Putten | 3 |
| Nijmegen | 3 |
| Leerdam | 3 |
| IJsselstein | 3 |
| Hoofddorp | 3 |
| Harderwijk | 3 |
| Gorinchem | 3 |
| Goes | 3 |
| Geldermalsen | 3 |
| Epe | 3 |
| Enkhuizen | 3 |
| Eersel | 3 |
| Deventer | 3 |
| Breda | 3 |
| Almere Stad | 3 |
| Zwolle | 2 |
| Zoetermeer | 2 |
| Waalwijk | 2 |
| Vianen | 2 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 9 | 3% |
| AC 11–22 kW | 251 | 97% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 259 |
| Schuko | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.