EV charging stations in Drammen, Norway
On the map: 117 charging places from open sources, 87 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 45 locations (52%); 150 kW or more: 33 locations.
85% of the locations are confirmed by two or more sources; 95% were last confirmed in 2025 or 2026.
Without a known network: 18 locations.
Fast DC chargers from 50 kW per 10 public locations: 5.2 here, 4.3 on average across Norway.
Open data cover only part of the chargers here. Source
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Circle K Mjøndalen | Circle K | 400 | CCS2×4 | 11.2026 |
| Circle K Rosenkrantzgata | Circle K | 400 | CCS2×8 | 11.2026 |
| Circle K Rundtom | Circle K | 400 | CCS2×7 | 11.2026 |
| Automat 1 Kobbervikdalen | Network not known | 350 | CCS2×6, CHAdeMO | 11.2026 |
| Buskerud Storsenter | Eviny | 350 | CCS2×16, Type 2×10, CHAdeMO×6 | 11.2026 |
| Driiv - Svelvik | Network not known | 320 | CCS2×6 | 11.2026 |
| Kople Kiwi Steinberg | Kople | 320 | CCS2×4, CHAdeMO | 11.2026 |
| Uno-X 7-Eleven Gullaug EL | Uno-X | 300 | CCS2×8 | 11.2026 |
| Uno-X 7-Eleven Langebru EL | Uno-X | 300 | CCS2×4 | 11.2026 |
| Uno-X Gulskogen EL | Uno-X | 300 | CCS2×4 | 11.2026 |
| Hokksund, Norway | Tesla | 250 | CCS2×24 | 11.2026 |
| Krokstad, Norway | Tesla | 250 | CCS2×19 | 11.2026 |
| Recharge St1 Brakerøya | Recharge | 225 | CCS2×8, CHAdeMO×5 | 11.2026 |
| Recharge Esso Amtmannsvingen | Recharge | 200 | CCS2×7, CHAdeMO×2 | 11.2026 |
| Recharge Esso Farmen | Recharge | 200 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Recharge Esso Hokksund | Recharge | 200 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Recharge Esso Park | Recharge | 200 | CCS2×6, CHAdeMO×2 | 11.2026 |
| Recharge St1 Sande | Recharge | 200 | CCS2×7, CHAdeMO×2 | 11.2026 |
| Strømsø Senter | Ragde Charge | Ragde Charge | 200 | CCS2×4 | 11.2026 |
| YX Klokkarstua | Kople | 200 | CCS2×4, CHAdeMO×2, Type 2×2 | 11.2026 |
| Kople Eiker Senter Hokksund | Kople | 180 | CCS2×12, CHAdeMO×6, Type 2×4 | 11.2026 |
| Kople Meny Klokkerjordet Sande | Kople | 180 | CCS2×5, CHAdeMO | 11.2026 |
| Kople Strømsø Senter Drammen | Kople | 180 | CCS2×8 | 11.2026 |
| Kople Åmot sentrum | Kople | 180 | CCS2×4 | 11.2026 |
| Albjerk Bil Drammen | Lade i Norge | 150 | Type 2×15, CCS2×2 | 11.2026 |
| Aldbjerk Bil Lier | Charge & Drive | 150 | Type 2×15, CCS2×2 | 11.2026 |
| Burger King Lier | Tesla | 150 | CCS2×12, CHAdeMO×12 | 11.2026 |
| CC Drammen | Eviny | 150 | Type 2×8, CCS2×7, CHAdeMO×4 | 11.2026 |
| Gulskogen Senter | Mer | 150 | CCS2×8, CHAdeMO×8 | 11.2026 |
| Kople Tollerud nord rasteplass E18 | Kople | 150 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Kople Tollerud sør rasteplass E18 | Kople | 150 | CCS2×8, CHAdeMO×2 | 11.2026 |
| Max Hamburger Lier | Tesla | 150 | CCS2×2, CHAdeMO×2 | 11.2026 |
| Recharge Esso Kobbervikdalen | Recharge | 150 | CCS2×6, CHAdeMO×6, Type 2 | 11.2026 |
| Automobil-Kompaniet Hurtigladestasjon, Drammen | Network not known | 50 | CHAdeMO | 11.2026 |
| Drammen - Marienlyst | Mer | 50 | CCS2×2, CHAdeMO×2 | 11.2026 |
| Extra Heggtoppen | Mer | 50 | CCS2×3, CHAdeMO×3, Type 2×2 | 11.2026 |
| Kople Solberg Sportsklubb | Kople | 50 | CCS2×4 | 11.2026 |
| Obs Bygg Mjøndalen | Mer | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 11.2026 |
| Recharge Buskerud Bilsenter | Recharge | 50 | CHAdeMO×2, CCS2×2 | 08.2023 |
| Recharge Kiwi Lerberg | Recharge | 50 | CCS2, CHAdeMO | 11.2026 |
| Recharge Kiwi Nordre Jarlsberg Brygge | Recharge | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 11.2026 |
| Recharge Kiwi Åmot sentrum | Charge & Drive | 50 | Type 2×3, CHAdeMO, CCS2 | 10.2026 |
| Recharge McDonald's Åssiden | Recharge | 50 | CCS2×3, CHAdeMO×3 | 11.2026 |
| Recharge St1 Mjøndalen | Recharge | 50 | CCS2×3, CHAdeMO×3, Type 2×2 | 11.2026 |
| Røykenbadet | Network not known | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 11.2026 |
AC chargers: 41. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 16 | 18% |
| AC 11–22 kW | 25 | 29% |
| DC under 50 kW | 1 | 1% |
| DC 50–149 kW | 12 | 14% |
| 150 kW and more | 33 | 38% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 53 |
| CCS2 | 45 |
| CHAdeMO | 30 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.