EV charging stations in Castelo Branco, Portugal
On the map: 40 charging places from open sources, 37 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 16 locations (43%); 150 kW or more: 7 locations.
57% of the locations are confirmed by two or more sources; 22% were last confirmed in 2025 or 2026.
Without a known network: 2 locations.
Fast DC chargers from 50 kW per 10 public locations: 4.3 here, 3.6 on average across Portugal.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| IONITY Castelo Branco Leste | IONITY | 350 | CCS2×4 | 11.2023 |
| IONITY Castelo Branco Oeste | IONITY | 350 | CCS2×4 | 10.2026 |
| Castelo Branco Supercharger | Tesla | 250 | CCS2×16 | 12.2025 |
| CTB-00081 | Charging Together | 200 | CCS2×2 | 10.2026 |
| CTB-00016 | Iberdrola | bp pulse | 160 | CHAdeMO, CCS2 | 03.2023 |
| CTB-00073 | Moon | 150 | CCS2×2 | — |
| VVR-00007 | Iberdrola | bp pulse | 150 | CCS2×2, CHAdeMO | 10.2026 |
| CTB-00049 | PRIO | 120 | CHAdeMO, CCS2 | — |
| CTB-00027 | Powerdot | 100 | CCS2×3, CHAdeMO, Type 2 | 08.2025 |
| CTB-00034 | Atlante | 60 | CHAdeMO, Type 2, CCS2 | — |
| CTB-00048 | Helexia | 50 | CCS2×2 | — |
| CTB-00056 | MOBI.E | 50 | CHAdeMO, Type 2, CCS2 | 05.2021 |
| CTB-00057 | Galp | 50 | CHAdeMO, Type 2, CCS2 | — |
| CTB-00060 | Galp | 50 | CHAdeMO, Type 2, CCS2 | — |
| CTB-00063 | Helexia | 50 | CCS2×2 | — |
| Continente Modelo Castelo Branco | Continente Plug&Charge | 50 | Type 2×2, CHAdeMO, CCS2 | 06.2023 |
AC chargers: 15. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| MOBI.E | 11 |
| Atlante | 3 |
| Charging Together | 3 |
| Helexia | 3 |
| Continente Plug&Charge | 2 |
| Galp | 2 |
| IONITY · on the map | 2 |
| Iberdrola | bp pulse | 2 |
| Powerdot | 2 |
| EDP | 1 |
| Moon · on the map | 1 |
| PRIO | 1 |
| Repsol | 1 |
| Tesla · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 6 | 16% |
| AC 11–22 kW | 9 | 24% |
| DC 50–149 kW | 9 | 24% |
| 150 kW and more | 7 | 19% |
| DC, power not stated | 1 | 3% |
| Power not stated | 5 | 14% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 21 |
| CCS2 | 17 |
| CHAdeMO | 9 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.