EV charging stations in Nizhny Novgorod, Russia
On the map: 72 charging places from open sources, 67 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 65 locations (97%); 150 kW or more: 10 locations.
85% of the locations are confirmed by two or more sources; 16% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 9.7 here, 7.3 on average across Russia.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Баженова 8Б | Punkt-E | 150 | CCS2×4, GB/T DC×2 | 04.2026 |
| Бульвар Мира 7 | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Волжская набережная 13 | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Героев Космоса 2А | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Дьяконова 11А | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Львовская 8А | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Мечникова 75 | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Федосеенко 9 | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Чаадаева 28 | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| Южное шоссе 2Д | Punkt-E | 150 | CCS2×2, GB/T DC | 04.2026 |
| 60-летия Октября | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| FLY 393 | Electrifly | 120 | CHAdeMO, GB/T DC, CCS2 | 06.2023 |
| FLY 394 | Electrifly | 120 | CHAdeMO, GB/T DC, CCS2 | 03.2023 |
| FLY 396 | Electrifly | 120 | CHAdeMO, GB/T DC, CCS2 | 06.2023 |
| FLY 399 | Electrifly | 120 | CHAdeMO, GB/T DC, CCS2 | 06.2023 |
| FLY 400 | Electrifly | 120 | CHAdeMO, GB/T DC, CCS2 | 03.2023 |
| Алексеевская 2 | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Бекетова | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Белинского | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Бетанкура | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Богородского | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Большая Покровская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Верхне-Волжская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Володарского | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Гагарина | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Горная | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ефремова | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Живописная 10 | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ильинская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Исполкома | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Карла Маркса | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ковровская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Коминтерна | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Крупской | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Кулибина | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ленина 109 | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ленина 56 | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Луначарского | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Максима Горького | Punkt-E | 120 | CCS2×2, GB/T DC | 03.2023 |
| Маркина | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Мещерский | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Молодёжный | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Народная | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Октябрьской революции | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Ольгино | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Печерская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Пискунова | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Площадь революции | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Пролетарская | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
| Революционная | Punkt-E | 120 | CCS2×2, GB/T DC | 07.2023 |
Showing 50 of 65 fast chargers; the map shows all.
AC chargers: 1. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Punkt-E | 58 |
| Electrifly · on the map | 5 |
| E-Way · on the map | 1 |
| Electro.Cars · on the map | 1 |
| RusGidro | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 1 | 1% |
| DC under 50 kW | 1 | 1% |
| DC 50–149 kW | 55 | 82% |
| 150 kW and more | 10 | 15% |
Connectors
| Connector | Locations |
|---|---|
| CCS2 | 65 |
| GB/T DC | 59 |
| CHAdeMO | 14 |
| Type 2 | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
| Source | Licence | Locations |
|---|---|---|
| Open Charge Map | CC BY 4.0 (provider licence shown on the point card) | 67 |
| OpenStreetMap | ODbL 1.0 | 57 |
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.