EV charging stations in Alicante, Spain
On the map: 64 charging places from open sources, 50 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 19 locations (38%); 150 kW or more: 6 locations.
82% of the locations are confirmed by two or more sources; 98% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 3.8 here, 4.2 on average across Spain.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Centro Porsche Alicante estación de carga 2 | Porsche | 350 | CCS2 | 11.2026 |
| Hotel Ibis Aguamarga | Electra | 300 | CCS2×4 | 11.2025 |
| Alicante Supercharger | Tesla | 250 | CCS2×20 | 03.2026 |
| Consum - Alicante | Iberdrola | bp pulse | 150 | CCS2×2, CHAdeMO | 11.2026 |
| ES_BP_SANDOVAL MD. ALICANTE | Iberdrola | bp pulse | 150 | CCS2×2 | 11.2026 |
| Parking Av. de la Estación Alicante | Iberdrola | bp pulse | 150 | CCS2×10, Type 2×4, CHAdeMO×3 | 11.2026 |
| Masymas Isla Corfu Alicante | Umbrella eMobility | 120 | CCS2×2, Type 2 | 11.2024 |
| A-ALICANTE-038 | Iberdrola | bp pulse | 100 | CCS2×2 | 11.2026 |
| BMW Begar Alicante | Iberdrola | bp pulse | 100 | CCS2×2 | 11.2026 |
| Parking Hospital General | Eranovum | 100 | Type 2×4, CCS2×2, CHAdeMO×2 | 11.2026 |
| A-ALICANTE-046 | Iberdrola | bp pulse | 60 | CCS2×2, CHAdeMO×2 | 11.2026 |
| C6E06BCC21XGSZMUUC | Endesa X Way | 60 | CCS2×2 | 11.2026 |
| US_161_Alicante_II | Plenoil | 60 | Type 2 | 11.2026 |
| A-Alicante-011 | Iberdrola | bp pulse | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| A-Alicante-016 | Iberdrola | bp pulse | 50 | CCS2×2, CHAdeMO×2, Type 2×2 | 11.2026 |
| A-Alicante-019 | Iberdrola | bp pulse | 50 | CCS2×2, CHAdeMO×2 | 11.2026 |
| A-Denia-005 | Iberdrola | bp pulse | 50 | CCS2×2, Type 2×2, CHAdeMO | 11.2026 |
| Repsol ES, Altet, S.L | Repsol | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| Repsol ES, CRED Los Angeles | Repsol | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
AC chargers: 29. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| Iberdrola | bp pulse | 17 |
| Mercadona | 8 |
| Endesa X Way | 5 |
| Eranovum | 3 |
| Pavapark | 3 |
| AENA EV | 2 |
| Repsol | 2 |
| Telepark | 2 |
| EDP | 1 |
| Electra · on the map | 1 |
| Plenoil | 1 |
| Porsche · on the map | 1 |
| Tesla | 1 |
| Umbrella eMobility | 1 |
| eTecnic | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 1 | 2% |
| AC 11–22 kW | 28 | 56% |
| DC under 50 kW | 2 | 4% |
| DC 50–149 kW | 13 | 26% |
| 150 kW and more | 6 | 12% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 40 |
| CCS2 | 20 |
| CHAdeMO | 10 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.