EV charging stations in Archena, Spain
On the map: 13 charging places from open sources, 11 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 6 locations (55%); 150 kW or more: 0 locations.
82% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Fast DC chargers from 50 kW per 10 public locations: 5.5 here, 4.2 on average across Spain.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| C6E06BCC21XYNWSVTH | Iberdrola | bp pulse | 60 | CCS2×2 | 11.2026 |
| Supermercado Consum Archena | Eranovum | 60 | CCS2×2, Type 2 | 11.2026 |
| Ayunt. Archena. Polideportivo | TotalEnergies | 50 | Type 2×3, CCS2, CHAdeMO | 10.2026 |
| TotalEnergies - Archena. Mercadona | TotalEnergies | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| TotalEnergies - Archena. Parking Ayuntamiento | TotalEnergies | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
| TotalEnergies - Archena. Plaza de Abastos | TotalEnergies | 50 | CCS2, CHAdeMO, Type 2 | 11.2026 |
AC chargers: 5. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| TotalEnergies | 6 |
| Iberdrola | bp pulse | 3 |
| Eranovum | 2 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 5 | 45% |
| DC 50–149 kW | 6 | 55% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 10 |
| CCS2 | 6 |
| CHAdeMO | 4 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.