EV charging stations in Santa Brígida, Spain
On the map: 16 charging places from open sources, 14 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (14%); 150 kW or more: 0 locations.
71% of the locations are confirmed by two or more sources; 93% were last confirmed in 2025 or 2026.
Without a known network: 4 locations.
Fast DC chargers from 50 kW per 10 public locations: 1.4 here, 4.2 on average across Spain.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| DISA TEROR | PRIO | 60 | CCS2×2 | 11.2026 |
| Rest. Balcón De Zamora | TotalEnergies | 50 | CCS2, CHAdeMO, Type 2 | 10.2026 |
AC chargers: 11. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| GC Movilidad Electrica | 7 |
| Endesa X Way | 1 |
| PRIO | 1 |
| TotalEnergies | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 2 | 14% |
| AC 11–22 kW | 9 | 64% |
| DC under 50 kW | 1 | 7% |
| DC 50–149 kW | 2 | 14% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 12 |
| Schuko | 5 |
| CCS2 | 3 |
| CHAdeMO | 1 |
Nearby cities
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.