EV charging stations in Kinna, Sweden
On the map: 18 charging places from open sources, 16 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 3 locations (19%); 150 kW or more: 3 locations.
31% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 1 location.
Fast DC chargers from 50 kW per 10 public locations: 1.9 here, 2.6 on average across Sweden.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Circle K Bollebygd | Circle K | 400 | CCS2×6, CHAdeMO×2 | 11.2026 |
| Skene | Eviny | 300 | CCS2×8, CHAdeMO×2 | 11.2026 |
| OKQ8 Kinna Lyddevägen | OKQ8 | 150 | CCS2×2 | 11.2026 |
AC chargers: 13. They are not listed one by one here; the map shows them all. AC chargers on the map
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 13 | 81% |
| 150 kW and more | 3 | 19% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 13 |
| CCS2 | 3 |
| CHAdeMO | 2 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.