Parkering Göteborg charging stations in Sweden
On the map: 38 charging places from open sources, 38 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 2 cities in Sweden; it is 1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 0 locations (0%); 150 kW or more: 0 locations.
100% of the locations are confirmed by two or more sources; 82% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Gothenburg | 35 |
| Partille | 3 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 10 | 26% |
| AC 11–22 kW | 28 | 74% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 38 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.