EV charging stations in Aydın, Turkey
On the map: 21 charging places from open sources, 21 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 17 locations (81%); 150 kW or more: 5 locations.
14% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 5 locations.
Fast DC chargers from 50 kW per 10 public locations: 8.1 here, 5.9 on average across Turkey.
Open data cover only part of the chargers here. Source
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| ZES OPS Mall | ZES | 400 | Type 2×16, CCS2×10 | 09.2025 |
| EN YAKIT Ototay Shell | En Yakıt | 180 | CCS2×2 | 03.2025 |
| En Yakıt - Aydın - Denizli Otoyolu - Aydın Yönü | En Yakıt | 180 | CCS2×2 | 10.2025 |
| En Yakıt - Aydın - Denizli Otoyolu - Denizli Yönü | En Yakıt | 180 | CCS2×2 | 10.2025 |
| Trugo - Aydın Auto King | Trugo | 180 | CCS2×2 | 02.2026 |
| 5 Şarj - PO Efeler | 5 Şarj | 120 | CCS2×2 | 09.2026 |
| 5 Şarj - PO Efeler | 5 Şarj | 120 | CCS2×2 | 09.2026 |
| Eşarj - Otopratik Efeler | Eşarj | 120 | CCS2 | 02.2026 |
| ZES - Parktürk Aydın | ZES | 120 | CCS2×2, Type 2×2 | 02.2026 |
| Trugo - Forum Aydın | Trugo | 80 | CCS2×2 | 02.2026 |
| otoWATT - Tarihi Sarıoğlu Lokantası 1953 | Network not known | 80 | CCS2×2 | 02.2026 |
| Tora - Forum Aydın | ToraŞarj | 60 | CCS2, CHAdeMO, Type 2 | 02.2026 |
| ZES - Aydın 5M Migros (Kipa AVM) | ZES | 60 | CCS2×2 | 02.2026 |
| ZES - Aymira Hotel & SPA | ZES | 60 | CCS2×2 | 02.2026 |
| otoWATT - Kurtuluş Otoparkı | Network not known | 60 | CCS2×4 | 02.2026 |
| otoWATT - Zafer Otoparkı | Network not known | 60 | CCS2 | 02.2026 |
| ovolt - Opet Petrol | Network not known | 60 | CCS2×2 | 02.2026 |
AC chargers: 2. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC 11–22 kW | 2 | 10% |
| DC under 50 kW | 1 | 5% |
| DC 50–149 kW | 12 | 57% |
| 150 kW and more | 5 | 24% |
| Power not stated | 1 | 5% |
Connectors
| Connector | Locations |
|---|---|
| CCS2 | 18 |
| Type 2 | 5 |
| CHAdeMO | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.