Fuuse charging stations in the United Kingdom
On the map: 51 charging places from open sources, 45 of them public. Not every charger that exists; places with reliability below 40 are not included.
The network is present in 26 cities in the United Kingdom; it is <1% of the public locations of the country shown here.
Fast DC charging from 50 kW: 13 locations (29%); 150 kW or more: 2 locations.
64% of the locations are confirmed by two or more sources; 56% were last confirmed in 2025 or 2026.
Cities
| City | Locations |
|---|---|
| Carlisle | 11 |
| Workington | 2 |
| Shrewsbury | 2 |
| Rhyl | 2 |
| Penrith | 2 |
| Kendal | 2 |
| Wellington · on the map | 1 |
| Swindon | 1 |
| Skegness | 1 |
| Prestatyn · on the map | 1 |
| Oswestry · on the map | 1 |
| Newtownards · on the map | 1 |
| Newtownabbey | 1 |
| Newburn | 1 |
| Lisburn | 1 |
| Leighton Buzzard · on the map | 1 |
| Kidderminster | 1 |
| Horwich · on the map | 1 |
| Dinnington · on the map | 1 |
| Consett | 1 |
| Castlereagh | 1 |
| Bideford · on the map | 1 |
| Ashington | 1 |
| Aberdeen | 1 |
| Telford | 1 |
| Craigavon · on the map | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 4 | 9% |
| AC 11–22 kW | 25 | 56% |
| DC under 50 kW | 1 | 2% |
| DC 50–149 kW | 11 | 24% |
| 150 kW and more | 2 | 4% |
| Power not stated | 2 | 4% |
Connectors
| Connector | Locations |
|---|---|
| Type 2 | 36 |
| CCS2 | 14 |
| CHAdeMO | 10 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.