EV charging stations in Newberg, United States
On the map: 34 charging places from open sources, 34 of them public. Not every charger that exists; places with reliability below 40 are not included.
Fast DC charging from 50 kW: 2 locations (6%); 150 kW or more: 0 locations.
85% of the locations are confirmed by two or more sources; 100% were last confirmed in 2025 or 2026.
Without a known network: 5 locations.
Fast DC chargers from 50 kW per 10 public locations: 0.6 here, 2.1 on average across United States.
Fast chargers (DC from 50 kW)
Fast chargers on the map| Location | Network | kW | Connector | Last confirmed |
|---|---|---|---|---|
| Newberg Ford | Ford | 120 | CCS1×6 | 11.2026 |
| Chevron - Newberg | EVCS | 50 | CCS1, CHAdeMO, Type 1 | 11.2026 |
AC chargers: 32. They are not listed one by one here; the map shows them all. AC chargers on the map
Networks
| Network | Locations |
|---|---|
| OpConnect | 10 |
| Tesla | 8 |
| Blink | 6 |
| EV Connect | 1 |
| EVCS | 1 |
| Ford | 1 |
| PowerPump | 1 |
| SemaConnect | 1 |
Locations by maximum power
| Power | Locations | Share |
|---|---|---|
| AC up to 7 kW | 13 | 38% |
| AC 11–22 kW | 19 | 56% |
| DC 50–149 kW | 2 | 6% |
Connectors
| Connector | Locations |
|---|---|
| Type 1 | 26 |
| Tesla (NACS) | 7 |
| CCS1 | 2 |
| CHAdeMO | 1 |
Sources and licences
Every location keeps the source of its data; the licence of each source is listed here. Network names belong to their owners.
Data is shown as is, without a guarantee of accuracy or availability. Check with the operator before you go. How reliability is computed and which sources are used: About the data. A mistake in a location can be reported with the “Report an error” button on its card on the map.